When we took delivery of our new boat in August 2004, our Catalina 34 came from the dealer with only one coat of anti-fouling bottom paint. After 2 years in salt water in the San Francisco Bay area, because Letting Go only received one coat we decided we needed to get a new bottom paint job. So in September 2006 we got the job done at the Mariner Boat Yard in Alameda, California.
We were very pleased with their work. They seemed to really care and did quality work at fair prices.
They put on 2 1/2 coats of anti-fouling bottom paint which they said ought to last at least 3 years.
We had them also add a great second bilge pump, wiring, switch and piping for it.

Mariner Boat Yard owner Pete Van Inwegen in front of Letting Go - Catalina 34 2005 number 1688
Peter Van Inwegen, former owner of Mariner Boat Yard in front of 2005 Catalina 34 Letting Go

Mariner Boat Yard installed a second bilge pump
Mariner Boat Yard also installed a 2nd bilge pump for us.

wing keel on Catalina 34 after a new bottom paint job
Mariner Boat Yard did an outstanding job
(now called The Boat Yard at Grand Marina).

another angle to show the wing keel
Another angle of the wing keel


Note the safety chains between the stands.


They cleaned and installed 3 sacrificial zincs to the prop area.


It was obvious that they cared. They used protective paper.


They also added more paint under the keel.


Back to the water.


Now with 2 1/2 coats of paint we hopefully won't need another haul out for 3 - 5 years.